SPRING ST KERSBROOK DRAINAGE UPGRADE
SPRING ST KERSBROOK DRAINAGE UPGRADE
Project Category: Stormwater Infrastructure
Spring St Kersbrook over the past several years have been subject to flooding and as such, council have required to redesign and restructure the areas drainage capacity in line with 1/10yr drainage models.
The main street 1050 dia pipeline was required to be upgraded to a 3700 x 1200 RCBC. 7 existing residential driveways required there 1050 dia pipeline to be upgraded to a 2700 x 1200 RCBC.
Works were completed during winter under challenging conditions. Insitu concrete bases were constructed by Neo with precast culverts procured and insitu wingwalls poured. A full clean out and widening of the existing creek line was warranted on site during construction.
SCOPE OF WORKS:
• 15m of 3700 x 1200 RCBC
• 35m of 2700 x 1200 RCBC
• Cast Insitu concrete culvert bases
• Cast Insitu Wingwalls
• 200m of creek clearing and widening
• 100m of geofab and rock lined swales
• Verge & Road Reinstatement
CONTRACT DETAILS:
• Duration: April 2019— July 2019
• Value: $600k
• Client: Adelaide Hills Council
• Superintendent: Adelaide Hills Council