Blewitt Springs Bridge & Road Reconstruction
BLEWITT SPRINGS BRIDGE AND ROAD RECONSTRUCTION
Project Category: Bridge Infrastructure
Blewitt Springs Road is the only B-Double approved route connecting many wineries to Main Road in McLaren Flat. As the existing bridge was not designed to withstand these high loads and volumes of trucks, it began showing signs of failure. Neo were contracted to undertake the construction of a new RCBC bridge, along with a road reconstruction and long spanning in-situ concrete retaining wall. Due to the inconvenience and high publicity surrounding the closure of the road, it was vital for Neo to complete the bridge construction within the prescribed construction period to avert lost transport productivity.
SCOPE OF WORKS:
• Construction of in-situ concrete retaining wall, slab and footing
• Demolition and disposal of existing bridge
• Installation of new RCBC Bridge
• Shoulder widening excavation and pavement works
• Road reconstruction
• Removal and reinstatement of W-Beam guardrail
CONTRACT DETAILS:
• Duration: October 2018— December 2018
• Value: $727k
• Client: City of Onkaparinga
• Superintendent: City of Onkaparinga