Port Pirie Floodway Replacement
PORT PIRIE FLOODWAY REPLACEMENT
Project Category: Infrastructure
Due to the major weather event in September 2016, four critical floodways were damaged beyond repair. Neo were engaged to replace the four floodways located within council boundaries prior to the onset of the 2018 winter rains.
Utilising Neo’s own concrete division, Neo were able to quickly get in and get out, a critical factor in working in the all year-round active Broughton River.
SCOPE OF WORKS:
• Removal of 4 damaged Floodways
• Construction of 4 new floodways
• Construction of Coffer dams
• 1.5m high concrete cut off walls
• Low flow culvert crossings
• Pavement Reinstatement
• Extensive Dewatering
CONTRACT DETAILS:
• Duration: February—June 2018
• Value: $340,000
• Client: Port Pirie Regional Council
• Superintendent: MACE Engineering